Guide for builders

How to find extension work from planning applications

Every extension that needs permission goes on the council's planning register before anyone builds it. Here's how to use that register to find work, step by step, and what it costs you in time.

Why the planning register

In the year to June 2026, councils in England decided 145,609 householder applications, and about 90% were granted (MHCLG planning statistics, table PS2). Householder applications are work to existing homes: extensions, loft conversions with dormers, porches and similar. Each granted one is a homeowner with permission in hand who now needs a builder.

Most of them don't post the job on a lead site straight away. They ask friends, look online, and talk to whoever gets in touch and looks serious. The register tells you about the job before they've started looking. See the numbers for your district.

1. Find your council's planning register

Search for "[your council] planning applications search". Most councils use an online system where you can search by date, ward, application type and status, and many also publish a weekly list of applications received and decided. Bookmark the search page and set yourself a fixed time each week to check it.

If you work across council boundaries, you'll need each council's register. They're all separate.

2. Filter to householder applications

Use the application type filter to show householder applications only. That takes out new homes, commercial work, changes of use, advertisements, tree works and telecoms masts, none of which a residential builder wants to wade through. Some councils also list prior approvals for larger rear extensions separately: include them, because they're extensions too.

3. Received or decided?

You can write when an application is received, or when it's decided. Each has a trade-off:

When receivedWhen granted
TimingEarliest possibleWeeks later; most householder decisions are due within 8 weeks
CertaintyMight be refused or changedPermission in hand
Homeowner's moodStill waiting, may not want to talk builders yetReady to choose a builder

For a single letter, the week of the decision is usually the sweet spot: the homeowner has just had good news and is choosing who builds it.

4. Read the application properly

Open the description, the decision notice and the drawings. You're looking for:

  • What and how big: a single-storey rear extension, a wrap-around, a two-storey side extension, a dormer. The drawings give you the footprint.
  • Rough value: enough to tell a £10,000 porch from a £200,000 rebuild before you spend more time on it.
  • Conditions: materials, pre-commencement conditions, anything that tells you how complicated it is.
  • The agent: if an architect or designer is named, they may be running the tender. That's a business contact worth building a relationship with, separately from the homeowner.

5. Make one, proper approach

Write once, by post, to "The Homeowner" at the site address. Congratulate them, say who you are and why you're a good fit, and make it easy to say no. Never phone, email or knock on the door from this information. Pegline's guides cover what to write and the data protection rules, and the letter generator does the wording for you.

6. Track what works

Keep a simple log: application reference, address, type of work, rough value, date posted, whether they replied, and whether you won it. Put a short reference on each letter so you can tell which one a caller is responding to. After a few months you'll know which kinds of job reply best, and what each won job cost you. Try the lead cost calculator with your own numbers.

Keep a separate do-not-contact list of anyone who asked not to be written to, and check it before every batch.

What it costs in time

Done by hand, this is a weekly job: searching the register, opening each application, reading drawings, writing letters and keeping the log. It works, but it's the kind of task that slips in a busy month, which is exactly when you need the pipeline full for later.

That's the job Pegline does. It reads your council's register every day, explains each application in plain English with an indicative build cost, filters out work that isn't yours, and prepares the letter. One builder holds each district, so nobody else on Pegline sees the same list. See how it works.

Questions

How do I find planning applications near me?

Search your council's online planning register and filter to householder applications. Many councils also publish a weekly list.

Is it better to contact homeowners before or after permission is granted?

For a single letter, the week permission is granted is usually best: the homeowner knows the job is going ahead and is choosing a builder.

How many extension applications are there in my area?

Each Pegline district page shows the number of householder applications decided in the last year, from government statistics.

One builder per district. Is yours still free?

Tell Pegline your district and the work you do. You'll get a straight answer, and a look at the jobs in your patch this week.